top of page
  • Writer's pictureThe Ad Agency

Did you know?


The Institute for Business and Home Safety recommends homeowners conduct the following preventative maintenance.

  1. After flushing, remain in or near the bathroom until the fill valve has finished refilling the bowl.

  2. If the bowl or tank begins to overflow, turn off the water at the supply valve.

  3. Inspect the flushing mechanism inside the toilet every six months.

  4. The fill valve should shut off when the float reaches the proper water level.

  5. Replace the flapper or fill valve assembly if you notice intermittent or constant tank refilling when the toilet is not in use.

  6. Inspect the supply line every six months.

  7. Ensure the connection to the valve is secure.

  8. Operate the valve to make sure the water supply will shut off. Replace if needed.

0 views0 comments

Recent Posts

See All

The extent of water damage is not as easy to detect as many would think. While a wall or floor may look dry doesn’t necessarily mean it is. At Sincerely Yours, Inc. we use different kinds of meters to

bottom of page